Day #132: Sauna Finalization & Finnish Weather Conditions

Maanantaina 1. helmikuuta 2010 · Marius

sorry, but no comments from site as i haven’t been there (as i’m ill since two days).

img_0594.jpgimg_0595.jpgimg_0596.jpgimg_0599.jpg

Day #131: Sauna & Sliding Door Near Kitchen

Maanantaina 1. helmikuuta 2010 · Marius

please note that the sliding door had been custom made by HONKATALOT chief constructor. we placed isolation inside to ensure to have a sound barrier.

img_0576.jpgimg_0577.jpgimg_0579.jpgimg_0581.jpg

we needed to protect the steam shelter a bid as it’s not for sauna temparatures. so we decided to double the batten installation, placing styropor to protect it from drying out too fast. next was of course the aluminium steam shelter. ;-)

img_0584.jpgimg_0585.jpg

also we finished the steam shelter work by taping all gaps between OSB and wooden pillars to prevent steam getting into the floor.

img_0589.jpg

Day #130: Sliding Door Wind Chamber

Maanantaina 1. helmikuuta 2010 · Marius

dscf1057.jpgdscf1058.jpgdscf1060.jpg

Day #129: Panelling Work

Maanantaina 1. helmikuuta 2010 · Marius

img_0569.jpgimg_0570.jpgimg_0572.jpg

Day #128: Panelling Work

Maanantaina 1. helmikuuta 2010 · Marius

img_0565.jpgimg_0566.jpgimg_0568.jpg

Day #127: Panelling Work Started

Maanantaina 1. helmikuuta 2010 · Marius

HONKATALOT chief constructor started to install interior wall panels as well as interior door frames today. sorry, no pics of this day.

Day #126: Chief Constructor Is Back

Maanantaina 1. helmikuuta 2010 · Marius

today the chief constructor of HONKATALOT came back to the site to do some final work.

Day #125: Electrician Finishes Preparation Work

Maanantaina 1. helmikuuta 2010 · Marius

the electrician finished all the cable preparation work today. finally he installed the cabinet at the wall in technic room. parallel i went behind him secretly to check whether there had been any non commented holes in the steam shelter: remember, the electrician is the main enemy of your steam shelther.

next i had to install the paper at the walls which prevents that isolation dust will smuggle itself through the panels creating dust within the interior rooms. please note: this had been a great advise of our HONKATALOT chief constructor. thanx once again for the hint.

img_0556.jpgimg_0558.jpgimg_0562.jpg