Day #131: Sauna & Sliding Door Near Kitchen
Maanantaina 1. helmikuuta 2010 · Mariusplease note that the sliding door had been custom made by HONKATALOT chief constructor. we placed isolation inside to ensure to have a sound barrier.
we needed to protect the steam shelter a bid as it’s not for sauna temparatures. so we decided to double the batten installation, placing styropor to protect it from drying out too fast. next was of course the aluminium steam shelter.
also we finished the steam shelter work by taping all gaps between OSB and wooden pillars to prevent steam getting into the floor.
Day #130: Sliding Door Wind Chamber
Maanantaina 1. helmikuuta 2010 · MariusDay #129: Panelling Work
Maanantaina 1. helmikuuta 2010 · MariusDay #128: Panelling Work
Maanantaina 1. helmikuuta 2010 · MariusDay #127: Panelling Work Started
Maanantaina 1. helmikuuta 2010 · MariusHONKATALOT chief constructor started to install interior wall panels as well as interior door frames today. sorry, no pics of this day.
Day #126: Chief Constructor Is Back
Maanantaina 1. helmikuuta 2010 · Mariustoday the chief constructor of HONKATALOT came back to the site to do some final work.
Day #125: Electrician Finishes Preparation Work
Maanantaina 1. helmikuuta 2010 · Mariusthe electrician finished all the cable preparation work today. finally he installed the cabinet at the wall in technic room. parallel i went behind him secretly to check whether there had been any non commented holes in the steam shelter: remember, the electrician is the main enemy of your steam shelther.
next i had to install the paper at the walls which prevents that isolation dust will smuggle itself through the panels creating dust within the interior rooms. please note: this had been a great advise of our HONKATALOT chief constructor. thanx once again for the hint.