terve, i’m apologizing for being late with entries. well … no pics because it always had been dark when i arrived at the site. i have to say: framework is still there (but that’s not our problem). as well the windows boards on exterior wall became finished. also peter did proceed very fast installing all the tube in the floor for the sanitary installation. i will do some pictures of it tomorrow when i’m at the site. what worried me a bid is that i couldn’t find the roll with power chord earlier this evening… so i couldn’t switch on lights. *bummer*. anyhow… tomorrow i’ll close the bathroom floor with isolation and continue installing battens and osb-panels, so that main floor becomes more and more closed. i’m sure we’ll proceed fast. i’ll promise to do some pics of this weeks work tomorrow.
we’ll spend the evening on the annual christmas booth of german-finnish association (DFG Lippe e.V.), which is supported i. e. by my parents since decades. on the booth local people can buy lapinkulta as well as hirvis and other interesting stuff. please note: detmold has a city partnership with savonlinna.
