Day #214: Closing Living Room Floor
Lauantaina 1. toukokuuta 2010 · Mariustodays job had been to close the floor in the living room as far as possible. due to a fault of mine we needed to wait until peter came back to the site (as i’ve hit a copper tube with one of the screws almost perfectly two weeks ago).
parallel tiling work continued by inserting the pavement to the shower area.